History

Shaft No. 1 at Sary-Bulak in the 1960s, archive photograph
Shaft No. 1 "Pioneer", 1960s (archive)

The history of the Combine begins with the geological survey of the Talas Alatau after the Second World War. Below are the main dates.

Year Event
Early 1950s Geologists of the republican geological survey map stibnite-bearing quartz veins in the Sary-Bulak gorge
1958 Construction of the Sary-Bulak mine begins
1961 Shaft No. 1 "Pioneer" is commissioned and the works are established under the USSR Ministry of Non-Ferrous Metallurgy
1961 to 1964 The Chatkal smelter is built in the Urmaral gorge
1964 The Chatkal smelter is commissioned. The mine and smelter are run together as the Iradi Antimony Combine
1960s The Kyzyl-Jar shafts are opened as an outlier of the Sary-Bulak mine
1971 The Antimony Expansion Directive finances Shaft No. 2 "Severny", a larger flotation mill, new roasting furnaces and a trioxide shop at Chatkal
1970s The Kemer mine is opened. Smelting capacity at Chatkal is increased about fourfold by the end of the decade
1992 Production stops for most of the year. Power cuts halt the dewatering pumps and the lower levels of Shaft No. 2 flood
1994 The territorial administration privatises the enterprise. The Sary-Bulak Antimony Works and the Chatkal Chemical Smelting Complex become joint-stock companies, controlled by the newly formed Iradi Antimony and Rare Metals Combine
1995 to 1997 The flooded levels are pumped out and the mine is re-equipped. The Kemer mine reopens in 1997
Late 1990s First long-term contracts with buyers in China
Early 2000s The "Central" incline is driven at Sary-Bulak
2007 Production stops for several months when rail links are cut
2009 The ISEZ Government acquires a minority shareholding
2011 The Kyzyl-Jar shafts reopen after closure in 2007
2012 Four miners are killed in a rockfall at Sary-Bulak; the miners' memorial at Rudnik is unveiled in 2013
2016 Sulphur dioxide scrubbers and electrostatic precipitators are installed at Chatkal
2018 A gas-capture unit at Chatkal begins converting sulphur dioxide into sulphuric acid
2024 Preparations begin for the Sary-Bulak Deep Levels Restart
2026 The Lieutenant Governor announces the phased restart of idle lines at Sary-Bulak and Chatkal