Sary-Bulak mine

The Sary-Bulak works and the Rudnik settlement in the Sary-Bulak Gorge
Sary-Bulak works and Rudnik settlement from the gorge road

The Sary-Bulak Antimony Works (SBAW) operates an underground stibnite mine and a flotation mill in the Sary-Bulak Gorge in the foothills of the Talas Alatau, at about 1,650 m above sea level and about 20 km south-south-west of Talas. It is the mining subsidiary of the Combine and the largest employer in Sary-Bulak District.

Key data

Item Details
Deposit Stibnite in quartz veins and breccia bodies along a fault zone in Palaeozoic limestone and shale
Access Shaft No. 1 "Pioneer" (1961); Shaft No. 2 "Severny" (1970s); "Central" incline (early 2000s)
Depth of workings about 750 m below surface
Mining methods Cut-and-fill and sublevel stoping
Ore treated about 350,000 t a year
Average head grade about 3% Sb
Concentrate 55 to 60% Sb
Employees about 2,300 (mine and services about 1,990; processing works 310)

Mining and processing

Ore is hoisted to the surface in skips through the two shafts and hauled by truck up the Central incline. At the mill it is crushed and ground, and froth flotation separates the stibnite into a concentrate. Most of the concentrate is sent to the Chatkal Chemical Smelting Complex. The rest is sold as concentrate and shipped by rail through Kazakhstan.

Idle lines and the restart

The Sary-Bulak mill was built for more ore than the mine now produces. Between 2020 and 2025 the No. 1 crushing section and part of the flotation mill were taken out of service, and ore above the capacity of the remaining lines was trucked to the Chatkal mill. The staff of the processing works fell from 1,860 at the end of 2019 to 310 at the end of 2025. Most of them moved to the mine, its workshops or the Chatkal mill, and the total number of people working at Sary-Bulak has stayed at about 2,300.

Since rail traffic on the Sary-Bulak spur was suspended, concentrate has travelled by truck to the Chatkal siding. The idle lines and the spur return to service in the first stage of the Restart Programme.

History

Construction began in 1958 and Shaft No. 1 was commissioned in 1961. Shaft No. 2 was sunk and the mill enlarged under the 1971 Antimony Expansion Directive. In 1992 power cuts halted the dewatering pumps and the lower levels of Shaft No. 2 flooded. They were pumped out between 1995 and 1997, when the mine was re-equipped with new loaders and drilling rigs.

Since 2024 the works have been preparing to deepen the Central incline and to reopen worked-out levels. See Sary-Bulak Deep Levels Restart.

In February 2012 four miners were killed in a rockfall in the old stopes of Shaft No. 2. Their names are on the miners' memorial at Rudnik.

Rudnik settlement

Most employees live in the works settlement beside the mine, known as Rudnik, with about 5,000 inhabitants, a school, a polyclinic and a house of culture. The settlement has a Syro-Iradi parish church, opened in 1995, and a Russian Orthodox chapel. Workers from the villages of the Talas valley travel by company bus.